Division: Utilities and Environment
Department: Saskatoon Light & Power
Term: 1 Permanent Full Time position available.
Closing Date: 09/10/2026
Labour Group: IBEW 319
Posting: 5701
This position is a IBEW 319 position and will be filled in accordance with the Collective Bargaining Agreement. Should it not be filled in accordance with the Collective Bargaining Agreement, external candidates will be considered.
Job Summary
Under the supervision of the Senior Project Management Engineer in charge of Smart Grid, this position oversees System Control at Saskatoon Light & Power.
This position monitors and controls the electrical system equipment to ensure its safe and efficient operation and maintains and upgrades all Supervisory Control and Data Acquisition (SCADA) system equipment. This position also provides leadership for the system and authorizes any switching outside the normal operating state.
Duties & Responsibilities
- Monitors the electric system for abnormal conditions and promptly takes appropriate action to restore electrical power safely and to return the system to a secure state, following outages or system disturbances.
- Maintains and updates Outage Management Systems during outages and abnormal system conditions.
- Operates, maintains and troubleshoots SCADA system and related infrastructure.
- Programs, tests, commissions and adjusts RTUs, PLCs and associated field instrumentation to establish communication between field devices and SCADA system.
- Performs routine backups of the SCADA system computer files and assists with software upgrades.
- Edits the SCADA system database and displays to reflect electrical system changes. Prepares specialized reports and custom control routines.
- Monitors the electric system and takes appropriate action to ensure that electrical power flows are within the capability of system equipment, that system voltages are within acceptable levels and the system is operating efficiently, which may include the control of power factor or peak demand, economical acquisition of bulk supply and minimizing losses.
- Sets appropriate alarm points to protect the system from abnormalities and manages the alarm points.
- Updates SAIDI and CAIFI indices monthly and reports to independent bodies like Electricity Canada.
- Prepares switching procedures and performs switching via the Supervisory Control and Data Acquisition (SCADA) system. Maintains logs of all switching operations and keeps equipment status accurately marked on the system schematics and virtual maps.
- Ensures that the appropriate reports and logs are completed for all power interruptions and component failures and are filed accordingly.